Operation

Camp

  • Capacity of 220 people to be increased to 400 in 2023

Production

  • First production in 2004

Power

  • 6 diesel generators servicing mine and camp

Mine

  • Underground mining operation, conventional drilling and blasting, with loading by underground loaders and transportation by underground dump trucks

Road

  • Self-built and maintained private gravel road with a length of 180 km, 114 bridges

  • Year-round access to the federal road and the port

  • Total distance from mine to port Petropavlovsk-Kamchatka 480 km

Product

  • Today: direct shipping ore concentrate, crushed, with a nickel content of min. 4%

  • Tomorrow: nickel concentrate Ni min. 9.5%, copper concentrate Cu min. 15%

Project

  • Construction of a nickel processing plant (flotation) within the next 2 years

  • First stage annual throughput capacity of 150,000 tons ROM

  • Metallurgical study completed

  • Flowsheet study completed

  • Engineering, design and construction study will be completed end of 4th quarter 2022.

  • All studies done by scientific research institute Irgiredmet Irkutsk, Russia

  • Start of groundwork preparation in 2nd quarter 2022

Contact

Contact

If you want to know more
about our business please contact us.

Contact Us