Camp
Capacity of 220 people to be increased to 400 in 2023
Production
First production in 2004
Power
6 diesel generators servicing mine and camp
Mine
Underground mining operation, conventional drilling and blasting, with loading by underground loaders and transportation by underground dump trucks
Road
Self-built and maintained private gravel road with a length of 180 km, 114 bridges
Year-round access to the federal road and the port
Total distance from mine to port Petropavlovsk-Kamchatka 480 km
Product
Today: direct shipping ore concentrate, crushed, with a nickel content of min. 4%
Tomorrow: nickel concentrate Ni min. 9.5%, copper concentrate Cu min. 15%
Project
Construction of a nickel processing plant (flotation) within the next 2 years
First stage annual throughput capacity of 150,000 tons ROM
Metallurgical study completed
Flowsheet study completed
Engineering, design and construction study will be completed end of 4th quarter 2022.
All studies done by scientific research institute Irgiredmet Irkutsk, Russia
Start of groundwork preparation in 2nd quarter 2022